Restoration of Murray Run at Ogden Road
Restoration of Murray Run at Ogden Road
Murray Run was experiencing excessive erosion where it passes through Pebble Creek Apartment complex. In some areas there were near vertical banks approximately 8 feet in height. The erosion was threatening to wash out an adjacent sanitary sewer, and it was beginning to threaten one of the nearby apartment buildings.

Under a unique agreement, as allowed by the Public Private Education Act (PPEA), the County and the private property owner, HHHunt Corporation, partnered to restore approximately 1,460 feet of stream using natural stream concepts.

The County agreed to obtain and administer a SLAF grant from DEQ to pay for 50% of the project cost and to be responsible for long term maintenance of the stream. HHHunt agreed to pay for the 50% local grant match to design and construct the restoration project and to perform routine maintenance activities.

HHHunt benefited from this project by transforming an eroding stream that was a liability into an amenity for its tenants. The County benefited by eliminating a source of excessive erosion and decreasing sediment and E. coli discharge to Murray Run. It is anticipated that this project will decrease sediment discharge by 226.3 tons/year.

PROJECT SUMMARY
  • Project completed July 2016
  • 1,460 linear feet of stream restored
  • 226.3 tons/year of sediment load reduction*
  • Total Cost $558,000
  • HHHunt Local Match $279,000
  • SLAF Grant $279,000


Murray Run at Ogden Road_thumb.png
Post-Construction: Naturally-restored shoreline, Murray Run at Ogden Road